Global Warming Prevention Technologies

In addition to holding patents for its NSRS technology, GWPT has pursued other Circle of Life Technologies including two water purification patents and the SIRT (Scrubbing Ionized Rain Tunnel) patented process that addresses a critical need. The SIRT process reduces toxic coal fired power plant emissions to zero by capturing them in an advanced, easily maintained, closed loop ionized water delivery system. As well, the final clean CO2 emissions can be sequestered within the tunnel to form a calcium carbonate product or other advanced technology CO2 applications.

While GWPT is focused on bringing NSRS units to market in 2011, development work will continue on SIRT and water purification technologies.

PDF Clean Coal Summary

NEWS view all>>
(8/15/2017)
@import url(/gwpt/greenkiteeditorstyle.css); GWPT'S NEW WEBSITE IS PLANNED TO BE ONLINE BY EARLY SEPTEMBER, 2017... more>>
(6/12/2016)
@import url(/gwpt/greenkiteeditorstyle.css); A new biomass to energy technology called the BEAR (Bio-energy Access and Recovery) system has been given the green light for design and development at GWPT in order to fast track the delivery of a commercial biomass waste only system. The new BEAR 1500-50 mini biomass (predominantly woody biomass) utility under early development is being fostered along side the MERC 2000-4000 heterogeneous waste processor which has also been renamed the BEAR 2500-85.... more>>
(3/4/2015)

In fiscal 2014 construction was completed on the mobile steel frame and platform (MFP) that carries the entire system for crane pick-up including operable gates and transport lugs. The gas filtration regime design/build process was begun (originally planned for construction at the CETC)   and all key components were positioned on the base frame bringing together the entire prototype as a whole.

... more>>
(3/1/2014)

Together with Fulton Engineered Specialties GWPT completes the first stage of the gas filtration modules and heat exchangers on the MERC 4000 stand-alone micro waste converter in Caledon Ontario. Final engine selection and CPU design is slated for June 2014 with CANMET and 3rd party advisors prior to delivery to CANMET in Ottawa for testing this fall.

... more>>
(2/14/2014)

The owners of the LEED designed home at 53 Hemford Crescent,   have sold the state-of-the-art custom built '2 Spruce House' designed by Steve Poulos of GWPT to a local Toronto family,

... more>>